US Grant Bridge
Concrete Cable Stayed
Portsmouth, OH, 2000
Portsmouth, OH, 2000
Project Role:
» Design of Concrete Alternative (URS)
» Design of Concrete Alternative (URS)
Project Description:
The bridge is a precast concrete, box-girder superstructure with a single plane of stay cables anchored in the median. Span lengths are 107m - 267m - 139m (350’ – 875’ – 455’). Dave Jeakle, Principal at Infinity was the Lead Design Engineer for developing the structural design for this concrete alternative, cable-stayed bridge crossing the Ohio River. The services were provided during employment with URS.