Back to Projects
Salmon River Bridge
Composite Steel Girder
British Columbia, 2007
Project Role:
» Detailed Design, Erection Engineering, and Demolition Engineering

Client: Surespan Construction Ltd.

Project Description:

The Salmon River Bridge is a four span continuous composite bridge with a total length of 80 meters. The existing glulam girder bridge was demolished and replaced with the new bridge using 3 of the existing 5 concrete piers. New steel column abutments were also fabricated and installed. A 110T Terex-American Crawler Crane was utilized to complete both the demolition and erection work.